Our project managers, coordinators and supervisors develop a test plan that covers all of the components and verifies the appropriate interfacing between components. In addition to creating the test plan, our work includes reviewing documents and specifications for balanceability during the design stage, construction observations, witnessing the pressure test, reviewing submittal data with close attention to the control submittal and submitting reports with findings. In implementing the test plan, we check for optimal noise, temperature and airflow conditions, plus performance of pressurization and smoke control systems. Tests cover peak demand and seasonal conditions. Testing procedures dynamically establish each control point calibration, location and name and how the point is displayed in the controls graphic package. A resolution-tracking document identifies deficiencies between the specified and observed performance. After deficiencies are corrected, we retest. The final product is complete documentation of performance data including all changes to sequences of operation and the pertinent submittals, plus plans identifying our report document schedule line numbers — all presented in an electronic format that is easy for facility engineers and maintenance staff to reference. |
![]() |
||