1979
Kane graduated from Tomball High School in Texas and spent a few semesters at Texas A&M studying Biomedical Science. Prior to joining EAB, Kane gained experience in Home Building, Septic System Installation, and Elevator Installation.
1983
Kane joined EAB as a Technician in Training.
1989
Kane was promoted to Project Supervisor. He tested and managed many large projects across a wide array of diverse industries.
1995
Kane oversaw the testing of the complete upgrade to the HVAC mechanical and controls systems for the restoration of the State Capitol Building in Austin, Texas. This project included a large number of supply air HVAC systems that were difficult to access. The control system testing and sequence verification included DDC and pneumatic components.
2000
Kane became a Project Coordinator and was instrumental in developing the control verification procedures used by EAB in testing HVAC systems. Kane was also in charge of training EAB Technicians in San Antonio, a process he led until 2019.
2001-2004
Kane supervised the USAA A-D Renovation in San Antonio. This was a large-scale project for the EAB San Antonio office. It involved replacing approximately 120 air handling units, and 2000 terminal units as well as replacing the exhaust fans and fan and coil units throughout the buildings.
2004
Kane was certified as a Test and Balance Engineer (TBE) by the Associated Air Balance Council (AABC) and took on the role of Project Manager at EAB.
2012
Kane oversaw the restoration of the Texas Governor’s Mansion. This was a high profile project with ground source heat pumps. After initial testing, we also assisted in troubleshooting humidity issues.
2014
Kane managed the testing of the Gillespie County Jail. This project included the testing of the smoke removal system, as well as proving the system to the Texas Jail Commission with a smoke control test.
2015
Kane oversaw the testing of the TAMU Pandemic Influenza Facility, a large pharmaceutical lab in College Station Texas. This required the testing of numerous lab spaces including BSL-3 spaces, as well as troubleshooting and adjusting for a pressure cascade through a large area with over 160 different pressure relationships that had to be maintained.
2018-2019
Kane oversaw the additions and renovations to the Christus Spohn Shoreline Hospital. This was the renovation of an existing hospital tower, the addition of a new tower and a new central plant. This project required numerous adjustments to HVAC systems to meet the required State health and safety requirements.
2019
Along with his team, Kane balanced the Texas Biomedical Research Institute BSL-3 Capacity Expansion Building in San Antonio, Texas. This project was the conversion of an existing space into a BSL-3 lab. Our testing and adjusting helped this project to attain their certification for use as a BSL-3 facility
Present
With a long and impressive career at EAB, Kane currently serves as a Project Manager in the San Antonio office.